Revision history of "File:2019-11-15 concrete-milepost-63 3754.jpg"

Jump to navigation Jump to search

Diff selection: Mark the radio boxes of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

  • curprev 17:26, 12 May 2021Jonathan talk contribs 299 bytes +299 The restored concrete milepost 63 on the Historic Columbia River Highway at Ruthton Point, just west of Hood River. It was placed in the Summer of 1992 as part of a rehabilitation of the Ruthton Point viaduct.<br /> 📷 Jonathan Ledbetter<br /> 📆 15 November 2019