File:2019-11-15 concrete-milepost-63 3754.jpg
Revision as of 17:26, 12 May 2021 by Jonathan (talk | contribs) (The restored concrete milepost 63 on the Historic Columbia River Highway at Ruthton Point, just west of Hood River. It was placed in the Summer of 1992 as part of a rehabilitation of the Ruthton Point viaduct.<br /> 📷 Jonathan Ledbetter<br /> 📆 15 November 2019)
Size of this preview: 400 × 600 pixels. Other resolutions: 160 × 240 pixels | 3,574 × 5,360 pixels.
Original file (3,574 × 5,360 pixels, file size: 13.09 MB, MIME type: image/jpeg)
Summary
The restored concrete milepost 63 on the Historic Columbia River Highway at Ruthton Point, just west of Hood River. It was placed in the Summer of 1992 as part of a rehabilitation of the Ruthton Point viaduct.
📷 Jonathan Ledbetter
📆 15 November 2019
File history
Click on a date/time to view the file as it appeared at that time.
Date/Time | Thumbnail | Dimensions | User | Comment | |
---|---|---|---|---|---|
current | 17:26, 12 May 2021 | 3,574 × 5,360 (13.09 MB) | Jonathan (talk | contribs) | The restored concrete milepost 63 on the Historic Columbia River Highway at Ruthton Point, just west of Hood River. It was placed in the Summer of 1992 as part of a rehabilitation of the Ruthton Point viaduct.<br /> 📷 Jonathan Ledbetter<br /> 📆 15 November 2019 |
- You cannot overwrite this file.
File usage
The following page uses this file: